庫(kù)藍(lán)陽(yáng)光型人工氣候室特點(diǎn):
▶先進(jìn)的節(jié)能設(shè)計(jì)理念:斷橋鋁建筑材料、鋼化中空玻璃、蒸發(fā)式冷氣機(jī)、數(shù)碼渦旋壓縮制冷系統(tǒng)、電子膨脹閥、iRV 智能識(shí)別節(jié)能運(yùn)行管理等措施實(shí)現(xiàn)綜合節(jié)能。
▶高智能化設(shè)計(jì):iRV 智能人工氣候室設(shè)計(jì),可根據(jù)季節(jié)和天氣情況,實(shí)時(shí)檢測(cè)戶外環(huán)境的溫度、濕度和光照情況、自動(dòng)識(shí)別,在保證氣候室內(nèi)技術(shù)條件要求的前提下,以能量最節(jié)約方式自動(dòng)開(kāi)啟和關(guān)閉設(shè)備(分別開(kāi)啟窗戶通風(fēng)、蒸發(fā)式冷氣機(jī)、恒溫恒濕空調(diào)、暖氣、遮陽(yáng)來(lái)適應(yīng)使用的目的)。
▶自動(dòng)光周期控制:根據(jù)氣象站檢測(cè)到的光照情況和人工設(shè)定的光周期,自動(dòng)開(kāi)關(guān)外遮陽(yáng)或補(bǔ)光燈。控制的最小間隔為30 分鐘,24 小時(shí)循環(huán)。
▶采用網(wǎng)絡(luò)化的分層管理系統(tǒng):即所有人工氣候室的控制器均進(jìn)行聯(lián)網(wǎng),由一臺(tái)管理計(jì)算機(jī)進(jìn)行集中管理,可在管理計(jì)算機(jī)上對(duì)所有人工氣候室的溫、濕度等各項(xiàng)數(shù)據(jù)進(jìn)行顯示、處理,對(duì)人工氣候室控制參數(shù)進(jìn)行修改,實(shí)現(xiàn)與在人工氣候室單元控制計(jì)算機(jī)上相同的功能。并可接入局域網(wǎng)和Internet 實(shí)現(xiàn)遠(yuǎn)程管理。
▶合理的氣流組織設(shè)計(jì):氣候室內(nèi)溫度、濕度、CO2 氣體濃度均勻性好,無(wú)氣流死角。
▶美觀大方:雙層中空鋼化玻璃幕墻設(shè)計(jì),隔熱性好,美觀實(shí)用。
Kooland Sunlight Phytotron:
▶Advanced energy conservation design concept:the measures that off-bridge aluminum building materials, tempering hollow glass, evaporation type air conditioner, digital vortex compression refrigerating system, electronic expansion valve, iRV Intelligent identification energy saving operation management and so forth implement comprehensive energy conservation.
▶High intelligent design: iRV Intelligent artificial climate chamber design which according to the season and weather real-time detect the outdoor environmental temperature, humidity, lighting condition and automatic identification, and also in the precondition of ensuring indoor technology conditions in climate enable and turn off equipment automatically in the most energy saving way( separately enabling window ventilation, evaporation type air conditioner, thermostatic and humidistatic air conditioning unit, heating installation and shading measure to adapt to the purpose of use).
▶Automatic photoperiodic control: in accordance with the lighting condition detected by meteorological station and the light cycle designated by people, to turn on and off window shading measure and fill light. The least interval of control is 30 minutes and the cycle is in 24 hours.
▶The network layer management system means all the artificial climate chamber of the controllers are networked and managed intensively by a management computer. It can display and process the various data that are all the artificial climate chamber temperature, humidity, etc on the management computer and modify artificial climate chamber control parameters to realize the same function with artificial climate chamber unit control computer. In addition to connect LAns and implement remote management on Internet.
▶Reasonable air organization design: in climatic chamber the homogeneity of temperature, humidity and gas strength of carbon dioxide is good and it is no airflow blind angle.
▶Elegant appearance: the design of double hollow toughened glass curtain wall has good thermal insulation and is aesthetic and practical. |